Enterprise News
Successfully Delivery of First Ever Vessel Without Asbestos

On Nov 14, one unit of 83M Piling Barge (TKG001) built for domestic owner has entered into completion stage and passed the four-side attestation among Owner, Class, Maritime Authority and Shipyard. On Nov 15, the final delivery and acceptance procedure was successfully carried out. This 83m Piling Barge is also offshore supply vessels delivered after the implementation of “Two Adjustment Policy” with three quality superiorities as: (a) The precise control of its core parts, 83M pile frame manufacturing and high technical content of one-time lifting and positioning, which indicates our shipbuilding level has been progressed; (b) Clean Flushing of hydraulic system has upgraded with the adoption of new technology and new craftsmanship; and (c) The Barge is the first vessel on which the Non-asbestos inspection was carried out by the third party. And the result is approved to be satisfactory to the owner.


Copyright 2011 by TAIZHOU KOUAN SHIPBUILDING CO.,LTD all rights reserved