Enterprise News
Christening & Delivery of 5th 208K BC

In the
morning of May 25, the Christening Ceremony for one 208K Bulk Carrier (TC0403)
built for German Oldendorff was held. Godmother Ms Eva Zhang christened,
unveiled and stoke champagne for the blessing of “Hemine Oldendorff”.
Shipyard
Executive Deputy General Manager, Mr. Cai Aiguo expressed in his speech, the
smooth construction and punctual delivery of this vessel, embodies the wisdom
and sweat of all shipyard workers and staffs, and benefits more from the strong
support of owner’s site supervision team represented by Mr. Hans Thorweger,
site surveyors of ABS and equipment suppliers. Your diligence, good cooperation
and rigorous management deeply impressed us. We do hope mutual good cooperation
can continue to make these seven series vessels to be a solid foundation in our
long term cooperation. This 208000T Bulk Carrier not only satisfies various
prevailing rules and regulations, but also adopted state of art equipment and
technology, and with character of environmental friendly and economical
performance. Trust the operation of Hermine Oldendorff will bring great fortune
to both owner and its clients.
The
Vessel was delivered on May 26. The main particulars of the Bulk Carrier: Loa:
299.95M; Bm: 50M; Dm: 24.9M; Lbp: 294.4M; Design Draft: 16.1M; Design Speed:
14.5Knots; Class: ABS