Enterprise News
Three Big Events were Achieved within Six days in this Fruitful Golden Fall
As the saying goes, “That which does blossom in the spring will bring forth fruit in the autumn”. In this harvest season, joyful news spread from new facilities: There are three big events achieved within six days, e.g. One Vessel docked out, one Vessel docked-in and one vessel was steel-cut. That means the target of third quarter was fully completed.
In the morning of Sep 21, the 2nd 92,500T Bulk Carrier (TK0206) built for Italian Owner was successfully docked out and shifted besides outfitting quay. In the morning of Sep 22, the Keel-laying of one 27,000T MPP (TK0504), which is built in compliance with PSPC, was carried out inside dry dock. In the afternoon of Sep 26, the steel-cut ceremony of first 76,000T Bulk Carrier (TK0701) built for Germany Owner was held at the combination workshop.
Ms Jin Xueping from QC Dept of Taizhou CATIC