
In the afternoon of April 18, the Keel-laying of the first 76,000T Bulk Carrier (Hull No. TK0701) built for Germany Owner was held inside the Dry Dock. The main Particulars of the Vessel: Loa: 225.00m; Bm: 32.26m; Dm: 19.50m; Speed: 14.25 Knots; Class: GL. Shipyard Outstanding Deputy General Manager, Mr. Wu Kefu; Assistant General Manager, Mr. Huang Qinghua, Owner’s representative and Class surveyor attended the Ceremony and have a photo taken as a memento.