> Distribution Center > Enterprise News

Enterprise News

  • 2013-1-25Steel-Cut of the 3rd 76K Bulk Carrier (TK0703)
  • 2013-1-25Keel-laying of the 1st 51K Bulk Carrier (TC0301)
  • 2013-1-25Successfully Delivery of 27K MPPV (Hull No. TK0511)
  • 2012-12-212nd 76000T Bulk Carrier was delivered for Operation
  • 2012-12-21Dock-Out of 1st 3820TEU Vessel built by Taizhou CATIC
Total Record:193 Total Pages:39 Home Previous Next Last  
Copyright 2011 by TAIZHOU KOUAN SHIPBUILDING CO.,LTD all rights reserved
苏ICP备11047132号 Designed by Wanhu